Side slip

Side slip (September-October 2011)

To free up space at the head of the slipway for other work, VIC 27 was moved sideways off the slipway.

100_8644
Above: Side slip perparation
Below left: Bogies in place  Below right: VIC 27 moved over (October 2011)
100_8802 100_8813

 

100_8812 100_8816
100_8810 100_8807